Our Portfolio
New Mexico Cheese Processor
- type:
- Waste Management
- services:
- Predesign study, Permitting assistance, Design engineering, Construction review assistance, System startup assistance
Flow: 275,000 gpd
BOD: 7,580 lbs/day
TSS: 3,750 lbs/day
Construction Cost: $1.0 million
Features
Influent flow equalization
Aerated lagoon biological treatment
D.O. control
Effluent flow control
Spray irrigation disposal