Wastewater Pretreatment System

type:
Waste Management
services:
Bench-scale test, Predesign report, Permitting assistance, Design engineering, Services during construction

Flow: 1.1 mgd

COD: 136,000 lbs/day

Biogas: 700 scfm to boilers

Construction Cost: $3.1 million

 

Features

Mixed influent equalization tank

UASB anaerobic process

Post-UASB effluent sulfide removal process

Biogas sulfur/moisture removal process

Effluent discharge to POTW