California Cheese Processor

Wastewater Pretreatment System

type:
Waste Management
services:
Predesign report, Permitting assistance, Design engineering, Services during construction

Flow: 600,000 gpd

BOD: 14,500 lbs/day

TSS: 3,500 lbs/day

FOG: 1,000 lbs/day

Construction Cost:  $5.0 million

 

Features

Influent lift station and rotary fine screen

Complete mix activated sludge system

Dissolved air flotation

Aerated sludge storage

Secondary clarification

Effluent discharge to POTW

Electrical/control building

Tank, equipment and building foundations

Elevated access platform