California Cheese Processor
Wastewater Pretreatment System
- type:
- Waste Management
- services:
- Predesign report, Permitting assistance, Design engineering, Services during construction
Flow: 600,000 gpd
BOD: 14,500 lbs/day
TSS: 3,500 lbs/day
FOG: 1,000 lbs/day
Construction Cost: $5.0 million
Features
Influent lift station and rotary fine screen
Complete mix activated sludge system
Dissolved air flotation
Aerated sludge storage
Secondary clarification
Effluent discharge to POTW
Electrical/control building
Tank, equipment and building foundations
Elevated access platform