Maine Starch Processor

type:
Waste Management
services:
Waste minimization review, Preliminary engineering study Equipment selection/specification, Services during construction

Flow:  100,000 gpd

FOG:  800 lbs/day

Construction Cost: $250,000

 

Features
Rotary drum screening
Gravity oil-water separator
Effluent discharge to POTW