Our Portfolio
Vermont Dairy Processor
- type:
- Waste Management
- services:
- Permitting assistance, Design engineering, Services during construction, Startup and operational assistance
Flow: 30,000 gpd
COD: 2,000 lbs/day
TSS: 1,000 lbs/day
FOG: 1,000 lbs/day
Construction Cost: $450,000
Features
Mixed influent equalization tank
Chemical conditioning
Dissolved air floatation
Multicell aerobic lagoon system
Effluent discharge to POTW