Our Portfolio
Texas Brewery
Wastewater Pretreatment System
- type:
- Waste Management
- services:
- Preliminary engineering report, Design engineering, Services during construction, Startup assistance
Flow: 1.7 million gpd
COD: 82,000 lbs/day
TSS: 11,000 lbs/day
Construction Cost: $5.0 million
Features
Screening
Equalization
Fluidized bed anaerobic process
Biogas utilization
Effluent discharge to POTW