Our Portfolio
South Carolina Prepared Foods Producer
Wastewater Pretreatment System




- type:
- Waste Management
- services:
- Bench-scale study, Predesign study, Permitting assistance, Design engineering, Services during construction, Startup assistance
Flow: 150,000 gpd
COD: 2,000 lbs/day
TSS: 1,200 lbs/day
FOG: 800 lbs/day
Construction Cost: $900,000
Features
Influent flow equalization
DAF pretreatment
Belt press dewatering of float
Aerated lagoon biological treatment
Effluent flow control and pH adjustment
Effluent discharge to POTW