Ohio Combined Wastes Facility, Phase 1
- type:
- Waste Management
- services:
- Sludge digestion report, Permitting, Design engineering, Services during construction, Operational assistance
Flow: 33,000 gpd
TSS: 27,400 lbs/day
Cogeneration: 350 kW
Construction Cost: $5 million
The city of Akron, Ohio and KB Compost Services, Inc. hired Applied Technologies for the initial digestion study, design engineering and construction related services on their Akron Compost Facility. Since 1991, KBCSI has been responsible for management, staffing, operations, and capital improvements at the facility. This facility processes approximately 70 million gallons of municipal sludge per year and produces approximately 100,000 cubic yards of compost annually. Needing updates, Applied Technologies took a 2 phase process on the facility in which they would focus on maximizing the digestion system. Phase 1 would be a CSTR and plug flow digester while phase 2 would use another plug flow digester.
Features
Processes biosolids and merchant wastes
High solids, plug flow, primary digester
Complete mix secondary digester
Combined, biogas-powered heat and power IC engine