Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

Madison Gas and Electric Company, Wisconsin

type:
Waste Management
services:
Pilot study, Predesign report, Permitting assistance, Design engineering, Services during construction

Sludge Dewatering System

Flow:  50 gpm

TSS:  24,000 lbs/day to 50% cake

Construction Cost:  $600,000

 

Features
Screw press technology
Chemical feed system
Sludge cake storage/loading building and conveying system