Our Portfolio
Madison Gas and Electric Company, Wisconsin
- type:
- Waste Management
- services:
- Pilot study, Predesign report, Permitting assistance, Design engineering, Services during construction
Sludge Dewatering System
Flow: 50 gpm
TSS: 24,000 lbs/day to 50% cake
Construction Cost: $600,000
Features
Screw press technology
Chemical feed system
Sludge cake storage/loading building and conveying system