Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

Illinois Fruit and Vegetable Processor

Wastewater Pretreatment System

type:
Waste Management
services:
Predesign study, Permitting assistance, Design engineering, Services during construction, Startup assistance

Flow: 32,000 gpd

BOD: 1,400 lbs/day

TSS: 100 lbs/day

Construction Cost: $900,000

 

Features

Influent flow equalization

pH adjustment

1.5 mile forcemain

Aerated lagoon biological treatment

Effluent storage

Effluent disposal on land