Our Portfolio
California Prepared Foods Processor
- type:
- Waste Management
- services:
- Evaluation report, Permitting assistance, Design engineering, Services during construction, Startup assistance
Flow: 120,000 gpd
BOD: 3,400 lbs/day
TSS: 2,000 lbs/day
FOG: 1,000 lbs/day
Construction Cost: $3.8 million
Features
Influent lift station with vertical fine screen
Complete mix activated sludge system
Dissolved air flotation
Aerated sludge storage
Secondary clarification
Effluent discharge to POTW
Electrical/control building