Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

California Prepared Foods Processor

type:
Waste Management
services:
Evaluation report, Permitting assistance, Design engineering, Services during construction, Startup assistance

Flow:  120,000 gpd

BOD:  3,400 lbs/day

TSS:  2,000 lbs/day

FOG:  1,000 lbs/day

Construction Cost:  $3.8 million

 

Features
Influent lift station with vertical fine screen
Complete mix activated sludge system
Dissolved air flotation
Aerated sludge storage
Secondary clarification
Effluent discharge to POTW
Electrical/control building