Village of Wrightstown

Wastewater Treatment Plant
 

Project Location
  • Wrightstown, Wisconsin


Design Capacity (average)

  • Flow: 0.423 mgd
     
Construction Cost
  • $4.6 million
Features
  • Expansion of existing plant
  • Influent pump station
  • Influent fine screening
  • Oxidation ditch
  • UV disinfection
  • Administrative building
  • Sludge storage tank
Services Provided
  • Facilities planning
  • Design
  • Construction administration and inspection
  • O&M manual