Illinois Fruit Processor

Wastewater Pretreatment System


Industry/Products
  • Fruits and vegetables
     

Design Capacity (average)

  • Flow: 32,000 gpd
  • BOD: 1,400 lbs/day
  • TSS: 100 lbs/day
     

Construction Cost

  • $900,000
Features
  • Influent flow equalization
  • pH adjustment
  • 1.5 mile forcemain
  • Aerated lagoon biological treatment
  • Effluent storage
  • Effluent disposal on land
Services Provided
  • Predesign study
  • Permitting assistance
  • Design engineering
  • Services during construction
  • Startup assistance
 

Sorry, but Javascript is not enabled in your browser!
  • Watts Communications
  • Watts Communications
  • Watts Communications