Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

Wisconsin Whey Processor

type:
Waste Management
services:
Preliminary engineering report, Design engineering, Permitting, Construction services, Startup assistance

Flow:  180,000 gpd
COD:  5,800 lbs/d
Construction Cost:  $1.8 million

 

Features
Replacement of aerated lagoon system with activated sludge system
Mixed influent equalization tank
Oxidation ditch with WAS pumping
Secondary clarifier and RAS pumping
Gravity belt thickener for WAS
Thickened sludge storage
WWTP building for thickener
MCC and controls
Effluent discharge to stream