Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

Texas Brewery

Wastewater Pretreatment System

type:
Waste Management
services:
Preliminary engineering report, Design engineering, Services during construction, Startup assistance

Flow: 1.7 million gpd

COD: 82,000 lbs/day

TSS: 11,000 lbs/day

Construction Cost: $5.0 million

 

Features

Screening

Equalization

Fluidized bed anaerobic process

Biogas utilization

Effluent discharge to POTW