Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

Minnesota Fruit Processor

type:
Waste Management
services:
Permitting, Design, Services during construction

Flow:  1.5 mgd

COD:  300,000 lbs/day

TSS:  10,000 lbs/day

Construction Cost:  $1.0 million

 

Features
Covered equalization pond
Hydrocyclone solids separation
Hot water and steam heating
Anaerobic contact process
Activated sludge process
Biogas utilization in dryers