City of Racine, Wisconsin
Bridge Replacement
Kinzie Avenue over Root River

Features

Services Provided
  • Replaced existing historic structure in kind with 66” arch 
  • Fields and wooded park adjacent to bridge
  • Construction of 300 feet of existing approach roadway
  • Riprap was used to control erosion
  • Texas rail and aesthetic lighting were used to enhance bridge appearance
  • Bridge design included precast arch plans as well as cast-in-place for contractor’s option
  • Design engineering
  • Services during construction

© 2008 Applied Technologies, Inc.