California Fruit Processor

Wastewater Pretreatment Plant
 

Industry/Products
  • Fruit
     
Design Capacity (average)
  • Flow: 0.3 mgd
  • COD: 20,000 lbs/day
  • Biogas: 120 scfm
     
Construction Cost
  • $6.5 million
Features
  • Two intake pump stations and piping
  • Retrofit existing tank for equalization tank
  • Anaerobic reactor
  • Calorix and mixing systems
  • Biogas flare
  • Distribution pumps and distribution piping
  • Retrofit existing tank for sludge holding
  • Post-equalization treatment system
Services Provided
  • Design engineering
  • Services during construction
  • Startup assistance