Wisconsin Duck Processor

Wastewater Treatment System

Design Capacity (average)
  • Flow: 75,000 gpd
  • COD: 12,000 lbs/day
  • TSS: 7,500 lbs/day
     
Construction Cost
  • $1.2 million
Features
  • Rotary drum screening
  • Complete mix anaerobic contact process
  • Activated sludge aerobic process
  • Land application of waste solids
  • Effluent discharge to land
Services Provided
  • Bench-scale test
  • Preliminary engineering report
  • Design engineering
  • Services during construction
  • Startup assistance
  • Operations assistance