Madison Metropolitan Sewerage District

Madison Metropolitan Sewerage District
8th Addition to the Nine Springs Wastewater Treatment Plant

Project Locatio
  • Madison, Wisconsin
Design Capacity (average
  • Flow: 50 mgd
  • BOD: 76,000 lbs/day
Construction Cos
  • $17.2 million
Features
  • Sludge screening/degritting
  • Digester structural rehabilitation
  • Analytical lab (6,800 square feet)
  • Engineering/administrative space (3,000 square feet)
  • Sludge pump station
  • Septage receiving
  • Digester gas utilization
  • Sludge storage tanks (18 million gals)
Services Provided
  • Services Provided
  • Design
  • Clean Water Fund financing
  • Construction administration
  • O&M manual/startup