Madison Metropolitan Sewerage District
8th Addition to the Nine Springs Wastewater Treatment Plant
Project Locatio
Design Capacity (average
- Flow: 50 mgd
- BOD: 76,000 lbs/day
Construction Cos
|
Features
- Sludge screening/degritting
- Digester structural rehabilitation
- Analytical lab (6,800 square feet)
- Engineering/administrative space (3,000 square feet)
- Sludge pump station
- Septage receiving
- Digester gas utilization
- Sludge storage tanks (18 million gals)
|
Services Provided
- Services Provided
- Design
- Clean Water Fund financing
- Construction administration
- O&M manual/startup
|
|