Sanitary Sewer System
Project Location
Construction Cost
Issues
- SSOs
- Sewer surcharging
- Basement backups
- Future growth
|
Features
- Population: 90,000
- 1.28 million foot sewer
- 10 lift stations
- 19 bypass locations
- 8 mil gal equalization tank
- 200 foot diameter excess flow clarifier
|
Services Provided
- Areawide sewer study
- Computerized hydraulic model
- Smoke testing
- Design of lift stations, force mains and relief sewers
- Construction administration/inspection
|
|