Bridge Replacement
Project Location
- Racine, Wisconsin
- Kinzie Avenue over Root River
Construction Cost
Challenge
- Historic arch bridge needed replacement due to age, condition and capacity
|
Features
- Replaced existing structure in kind with 66" arch
- Construction of 300 feet of existing approach roadway
- Riprap used to control erosion
- Texas rail and aesthetic lighting
- 200 feet of approach roadway work included in the intersection to the south
- Bridge design included precast arch plans as well as cast-in-place for contractor's option
- Fields and wooded park adjacent to bridge
|
Services Provided
|
|