Wastewater Treatment Facility
Project Location
Design Capacity (average)
Bioenergy Capacity (average)
- Flow: 240,000 gpd
- COD: 49,000 lbs/d
- Biogas: 210 scfm
- Power: 788 kW
- Heat: 4.6 MMBTU/hr
Construction Cost
|
Features
- Joint bioenergy project with local cheese producer
- UASB anaerobic treatment
- Two CHP engine-generators
- Anaerobic sludge digestion
- Activated sludge treatment
- Chemical phosphorus removal
- Chlorine disinfection
|
Services Provided
- Facilities planning
- Funding assistance
- User charge preparation
- Design
- Construction administration and inspection
- O&M manual
Click here to view additional photos.
|
|